The controller installation requires planning to ensure timely, successful installation with minimal complications and down time.
Consult an Electrical Inspector to review all wiring plans.
Create a Layout Plan drawing, per a Lighting Designer's or Architect's recommendation.
Consult FOBSUN Electronics Application Engineering Services as needed.


The 3 methods above are the most popular connection ways, and users can choose any one or mix-using.
FCD-310-L Power Extension Module works normally with its signal synchronous connection cable connected to any place of the output control cable.
Keep the output control cable within 20 meters to avoid voltage decline.
The length of the signal synchronous connection cable is unlimited by theory, and won't affect or weaken its synchronous performance.