http://www.fobsun.com     sales@fobsun.com

Fobsun

Installation Instruction for LED T5 Tube Light

Planning Installation

The installation of this device requires planning to ensure timely installation with minimal complications and down time.

Planning Suggestions

Consult an electrician or technician to review all wiring plans.
Create a layout plan drawing, as per a lighting designer's or architect's recommendation.
Consult FOBSUN Electronics Application Engineering Services as needed.

Installation Steps

Notes: Existing starter or ballast must be removed before LED T5 Tube Light being fixed into the fluorescent fixture.
Step 1: Turn off main power before installation. For safety, make sure main power source is switched off before attempting to install.
Step 2: Fix the holders or brackets fitted with T5 Tubes.
Step 3: Pre-wire T5 Tubes into power and light up.

Phone: 86-755-6118-7778 (English Service)    Fax: 86-755-6118-7077
Website:http://www.fobsun.com    Email:sales@fobsun.com
PrintClose